Transport and storage requirements of JA Solar PV Modules
4、 Remove the plastic protective film on the top. 2、 Remove the protective film. Rip the protective film outside the packing carton with box cutter or other hard thing. Be careful not to
If the original packaging is unavailable, put the solar inverter inside a suitable hard carton and seal it properly. Version:V200R001.This document describes the SUN2000-4.95KTL-JPL1 in terms of its installation, electrical connection, commissioning, maintenance, and troubleshooting.
The long side of the module to unpacked needs to be close to a solid support for about 15-20cm distance, the support could be a wall, rack or another unpacked module box of the same type, and then use scissors to cut all the packing strap of the outer box. Remove the top cover of the box, and then remove the carton by lifting it.
If the original packaging is available, put the solar inverter inside it and then seal it using adhesive tape. If the original packaging is unavailable, put the solar inverter inside a suitable hard carton and seal it properly.
DO NOT stand or walk on PV modules. Prior to beginning installation, review the Installation Manual for LONGi Solar PV Modules. Do not carry a module alone; always use two people to lift and carry. Do not drill holes in the frame of the module.
4、 Remove the plastic protective film on the top. 2、 Remove the protective film. Rip the protective film outside the packing carton with box cutter or other hard thing. Be careful not to
The transhipment movement of the packing box shall be completed before the outer packing case is removed, and after unpacking, it shall no longer be transshipped with no fixed
When using a forklift to move palletized packing boxes to the operation area, the forklift shall be slowly and steadily lifted and put down gently during loading and unloading, and the
The transshipment movement of the packing box shall be completed before the outer packing case is removed, and after unpacking, it shall no longer be transshipped with no fixed
Remove the top cover of the box, and then remove the carton by lifting it. Cut the 3 horizontal straps on the wooden N-shaped protectors and then remove the wooden N-shaped
Step 09: Remove outer packing straps Cut off all the packing straps outside the packing box. Attention: • Take additional care when cutting straps; strap may recoil.
Information on packaging and transport Winaico solar modules are delivered on pallets. The goods are packed in protective corrugated cardboard boxes and tied up with plastic straps. The
M:SUN2000-4.95KTL-JPL1;Smart PV inverter, Smart PV Controller, Cascading Packing a Solar Inverter If the original packaging is available, put the solar inverter inside it and then seal it
Photovoltaic inverter packaging box removal The inverter may supply AFCI in conventional grid-tied systems, but the inverter is isolated from the PV array in battery-based systems. Positioning the