Kaniv Pumped Storage Power Station
The project for the construction of the power plant, developed in 1985 by the Kharkiv Institute "Ukrhydroproject", envisaged the construction of a PSP with daily and weekly load regulation of the energy system with a capacity of 3600 thousand kW, consisting of 16 rotating hydro units with capacities of 225 and 250 thousand kW in generator and pump modes, respectively. Construction work on the PSP began in 1984. A pit for the upper reservoir was excavated, power lines